Front Page, July 27, 2022
The construction on Highway 50, heading out from the very western edge of Lake Geneva, is proceeding along, with asphalt being poured and then packed down with big highway rolling machines. About four inches of the road’s previous well-tarred and the very damaged surface was first removed with other special heavy-duty equipment.
Read More

